
CRH/UBH Interchange Trinidad
This road bridge of 600 meter long consist of 2 main beams with cross beams in between and a cantilever on both sides. The main beams were transported in 58 parts and welded on a platform behind the abutment. The bridge then was launched (in an inclined plane) in 8 phases before it achieved its final position.